Computeruser.com
Latest News

HD Supply Utilities and Trilliant Announce Smart Grid Pilot Program with Victoria Electric Cooperative

ORLANDO, Fla. REDWOOD CITY, Calif. July 19, 2011 HD Supply Utilities North America Trilliant Victoria Electric Cooperative Victoria, Texas Southeastern Texas

Blaine Warzecha

Victoria Electric’s pilot program will be a 90-day test phase to designated locations in their service area.  A successful implementation could mean a full rollout to their entire service territory.    Initial applications will be to improve operational efficiency, provide interval data for Critical Peak Pricing (CPP) and Time-of-Use (TOU) rates, and enhance outage detection.

A key component in HD Supply Utilities’ GridAdvance™ integrated, end-to-end Smart Grid solution, Trilliant’s SecureMesh multi-tier architecture enables the two-way flow of data to integrate the utility’s head-end systems with distribution, smart metering, and home devices. These sections of the grid correspond to communication tiers: a Wide Area Network (WAN) tier, which connects distribution devices and aggregates the Neighborhood Area Network (NAN) tier, which connects meters and aggregates the Home Area Network (HAN) tier, which connects in-home devices.

Victoria Andy White

Geff Smith

About Trilliant

www.trilliantinc.com

About HD Supply Utilities

North America www.hdsupply.com/utilities www.hdsupply.com North America

SOURCE Trilliant; HD Supply Utilities

Leave a comment

seks shop - izolasyon
basic theory test book basic theory test