Computeruser.com
Latest News

U.S. Navy Exercises Contract Option for Lockheed Martin to Build Fifth MUOS Satellite

SUNNYVALE, Calif. Feb. 7, 2011 $339.6-million

Mark Pasquale

Sunnyvale

The second satellite is also proceeding steadily in the production flow.  The team is preparing to mate the communications system module with the satellite’s propulsion core, allowing the team to begin environmental testing of the fully integrated satellite in preparation for delivery in 2012.

Sunnyvale, Calif. Scottsdale, Ariz. El Segundo, Calif. Chantilly, Va. San Diego, Calif.

Bethesda, Md. $45.8 billion

Media Contact:

Steve Tatum [email protected]

NOTE TO EDITORS:

http://www.lockheedmartin.com/MUOS/

SOURCE Lockheed Martin

Leave a comment

seks shop - izolasyon
basic theory test book basic theory test